Maglev Meeting Summary from October 2017

As many in this area are aware, there is a study underway for the feasibility of a Maglev high speed train system between Baltimore and Washington DC with 1 proposed stop at BWI airport.  Personally, I do not see the need for this type of system in general.  I have been watching this as it could dramatically impact home property values in Odenton, Bowie, Crofton and Gambrills area.

However if this train is considered, it seems to me that a stop at Fort Meade / NSA would make logistical sense.  Otherwise, this train basically does very little to help ease the stress on the roads from commuters.  That being said, the more and more I have looked at it, the less and less likely I believe it will actually become a reality in my lifetime regardless.  Below is the published notes from the October 2017 meeting if you have some additional interest in the proposals which are currently being floated around.

Transcript for Baltimore-Washington Superconducting Maglev Environmental Study
Project Process & Information Video
October 2017

Slide 1
Welcome and thank you for your interest in the proposed Baltimore-Washington Superconducting Maglev
Project.
Though we’re early in the process, the team encourages YOU to get involved with the environmental study.
Your feedback has a REAL potential to make this project better.

Slide 2
The project team has heard your expressed concerns loud and clear, and we are listening to you. Our staff is
available to discuss the project and study process with you. There will be multiple opportunities to
communicate with the Project Team, whether it’s through public meetings, submitting comment cards,
speaking over the phone, emailing, or posting comments to the website. We encourage you to provide your
comments, speak with our staff, and visit the project website to view updated project information and
responses to frequently asked questions.

Slide 3
Right now, the federal project is a grant studying the feasibility of a superconducting magnetic levitation (or ESSEE
maglev) train. Engineers and planners are currently finalizing technical specifications and weighing the
benefits and impacts of a proposed high-speed train service between Baltimore and Washington, DC. S-CMAGLEV
trains are now the fastest in the world, with cruising speeds more than 300 miles an hour.

Slide 4
Baltimore Washington Rapid Rail (or BWRR) is a private company that is proposing to construct the SCMAGLEV
system between Baltimore and Washington DC. Their proposal would provide an approximate 15-minute
service between the new Baltimore and Washington stations, and would run on a new, dedicated guideway –
partially through tunnel and partially elevated – with no surface-level intersections with existing roadways or
other railroads.

Slide 5
Congress authorized funding to *study* magnetic levitation projects in 2005’s ‘Safe, Accountable, Flexible,
Efficient Transportation Equity Act’.
The Federal Railroad Administration (or FRA) awarded $27.8 Million to the Maryland Department of
Transportation (or MDOT) to prepare an Environmental Impact Statement (or EIS) for BWRR’s proposal.
Please note, though, that no one has yet set aside money for construction.
2

Slide 6
At this stage, it is too early to determine if or how the project will affect any landowners because a final
alignment has not been determined.
A goal of the proposed project is to maximize the use of existing rights-of-way intended for transportation uses
and to minimize impacts to local communities and environmental resources. FRA and MDOT will have
additional details on these factors as the project progresses and with completion of the alternatives analysis.
Some alternative alignments will be eliminated from further study, and those alignments that are retained are
likely to continue to evolve to minimize impacts on communities and environmental resources.
Property owners can get a better idea of potential right-of-way impacts by examining maps of the alternative
alignments posted on the project website (www.bwmaglev.info) and at public meetings. It is important to note,
however, that FRA will likely adjust and refine alignments based on public and stakeholder input during the
study process.

Slide 7
Safety is of paramount importance. The safety and security for areas adjacent to the train facilities, as well as
on-board trains and at train facilities, will be evaluated as part of preliminary design and documented in the
EIS through coordination with relevant agencies, stakeholders, and technical experts. The Project Team will
research and document safety issues and best practices related to personal safety and security for passengers,
as well as address the safety and security of operating superconducting magnetic levitation trains under
various conditions and environmental factors, such as snow events and during times of poor conductor
visibility. The Project Team will also research and plan for potential threats such as terrorist attacks, fires,
explosions, and severe weather events.

Slide 8
The project includes three proposed stations: in Washington, DC, at BWI Thurgood Marshall Airport, and in
Baltimore City. The system would require one maintenance facility, support facilities such as ventilation shafts
along the route, and new electric substations.

Slide 9
The project team is led by FRA. Working for FRA at the state level is MDOT. MDOT serves as the grantee and
oversees the work being performed by the Maryland Economic Development Corporation or MEDCO, and the
Maryland Transit Administration or MTA, a transportation business unit of MDOT.
MEDCO is coordinating the engineering and design efforts being developed by the Private Project Sponsor
BWRR. MDOT-MTA is overseeing the NEPA compliance and EIS process, which is being conducted by the
Environmental Consultant AECOM.
3

Slide 10
The Alternatives Report will be published in the winter/spring of 2018, followed by the Draft EIS and
corresponding public hearing in fall of 2018. Once comments on the Draft EIS have been addressed, the Final
EIS and Record of Decision will be published in the Winter of 2019. Comments from the public and agencies
are welcomed and encouraged throughout the process.

Slide 11
The study area for the evaluation of potential environmental effects extends 40 miles from downtown
Washington, DC, north to downtown Baltimore, and from the I-95 corridor east to central Anne Arundel and
Prince George’s Counties, a distance of about 10 miles. The Study Area was developed by the Study Team to
define the area where SCMAGLEV could be implemented and the surrounding areas that could be affected by
the construction and operation of the proposed system.

Slide 12
In addition to neighborhoods and communities, the study area contains a number of important natural and
cultural resources. Most of the land in the study area is privately owned, but large federal, state and
institutional properties are located throughout the corridor.

Slide 13
There are many Parks located throughout the study area, some are large Federal and State lands, while others
are smaller community parks. The study team recognizes the importance and sensitivity of these parks and will
work to avoid, minimize and mitigate potential impacts as part of the study process.

Slide 14
Many key environmental considerations will be studied as part of this project such as environmental justice,
noise and vibration effects, electromagnetic fields, safety, and construction.

Slide 15
FRA and MDOT are coordinating with more than two dozen resource agencies to evaluate potential impacts to
natural resources and ensure ecosystems within the study area continue to thrive.
For each alternative alignment retained for detailed study, the team identifies these resources and evaluates
the nature and extent of the potential impacts.
Where possible, alignments are shifted to avoid or minimize impacts.

Slide 16
The proposed project is being studied with federal funds. Therefore, its potential environmental effects must
be evaluated and compared to a No-Build option, and comply with the National Environmental Policy Act (or
NEPA) review process.
4

Slide 17
On large projects like SCMAGLEV, NEPA studies are a multi-year process involving many steps, many agencies
at all levels of government, and many opportunities for public input. The goal of NEPA is to identify the
potential negative effects of the project, study alternatives that do the least possible harm, consider a ‘nobuild’
option when the adverse impacts could possibly outweigh project benefits, and throughout the process,
provide the public with the opportunity to provide input.
The results of this NEPA study will be published in an Environmental Impact Statement (or EIS) and available
for public review and comment. Federal, state, and local regulatory agencies will review the EIS and associated
public comments as part of the decision-making process.
Correspondence and feedback from citizens, residents, and other project stakeholders is encouraged
throughout the NEPA process and can be done a variety of ways. Perhaps the simplest way is through our
project website and email address. Please visit www.BWMaglev.info or email us at info@BWMaglev.info.

Slide 18
NEPA is also an umbrella law that encourages integrated compliance with other environmental laws. Because
this project is funded by the Federal Government, it must comply with the NEPA process and all corresponding
environmental laws and approvals.

Slide 19
The NEPA process consists of five steps, requiring significant coordination between the project team, public
stakeholders, elected officials, and governmental regulatory agencies.

Slide 20
Step 1 consists of initiating the NEPA process by publishing a Notice of Intent, submitting a draft Purpose and
Need, holding agency and public scoping meetings, developing initial preliminary project alternatives, and
accepting comments from the public during a 30-day comment period. For this project, the Notice of Intent
was published on November 25, 2016.

Slide 21
Step 2 consists of collecting data on existing conditions and screening potential alternatives. The alternatives
that do not meet the project purpose, sufficiently address needs, or contain fatal flaws or disproportionately
high impacts or costs are screened out and dropped.

Slide 22
In Step 3, the project team analyzes the remaining alternatives, and publishes an Alternatives Report.
5

Slide 23
In Step 4, the team determines a preliminary preferred alternative based on the analysis, publishes a Draft EIS,
holds public hearings, and accepts comments from the public for 45 days.

Slide 24
In Step 5, the team publishes the Final EIS, accepts comments from the public for 30 days, reviews the
comments, and publishes a Record of Decision.
The project team welcomes and encourages public and regulatory input throughout the entire NEPA process
and will review all comments received from citizens, residents, and other project stakeholders, and incorporate
the suggestions that will contribute to a successful outcome.

Slide 25
Thank you for participating in the SC Maglev project. For the most up to date information or to provide
comments and questions, please visit our website at www.bwmaglev.info. You can also email the project team
at info@bwmaglev.info.